Project portfolio

Tank farms, terminals, pipelines & plants engineered by Eng. Naim.

A selection of completed assignments across the Middle East, West Africa and Europe — each one chosen for the safety, throughput or cost outcome it delivered.

Filter projects
Country
Industry
Fuel TerminalLebanon
Amchit, Lebanon
Duration: 5 years

Renovation and Expansion of IPT Terminal

-70%
Power consumption
-70%
Maintenance cost
28,000 m³
Total tankage
13
Tanks (9 + 4 new)

Detailed design, construction supervision, material procurement assistance and project management for a complete revamp and extension of IPT Terminal. New facilities include delivery pump station, road tanker loading station, control room, firefighting system, piping network, storm-water and drainage system, electrical and instrumentation systems. Rehabilitation of nine existing storage tanks (16,000 m³) and construction of four new storage tanks (12,000 m³) — 28,000 m³ across 13 tanks.

Key outcomes

  • Custom gravity-assisted road tanker loading system that cut overall operations power consumption and maintenance cost by approximately 70 %.
  • Purpose-engineered closed-circuit API separator: steel construction, gravity oil and water removal, zero air emissions, minimal O&M footprint.
Chemical StorageGhana
Tema, Ghana
Duration: 4 months

Moisture Control System — FAP Polyol Oil Storage

Zero
Product contamination
Auto
Pressure control
4 mo
Concept to procurement

Detailed design and material procurement assistance for a dry-air / nitrogen blanketing system for polyol oil storage tanks. Scope included tank safety accessories and automated pressure-control equipment to maintain a continuous inert atmosphere above the stored product.

Key outcomes

  • Continuous dry inert atmosphere preventing hydrolytic contamination and extending product shelf life.
  • Automated pressure regulation across loading, unloading and ambient temperature cycles — minimal operator intervention required.
Heavy ManufacturingFrance
Maubeuge, France
Duration: 4 months

Drying Oven Optimization — FFM Steel / Stein Heurtey

-90%
Disqualified product
+5%
Yearly production
Auto
Thermal control

Engineering study and detailed design for optimizing and automating a painted steel plate drying oven during transitory operating periods. Objective: minimize losses by controlling thermal exchanges through the drying unit. Result: 90 % fewer disqualified plates and an approximately 5 % increase in yearly production.

Key outcomes

  • 90 % reduction in disqualified plates during transitory periods through precise control of thermal exchanges in the drying unit.
  • Approximately 5 % increase in yearly production recovered from the same transitory periods.
  • Optimized energy consumption while holding consistent product quality across operating regimes.
RefinerySaudi Arabia
Abqaiq, KSA
Duration: 1 year

Automatic Tank De-Watering System — Saudi Aramco Abqaiq Plant

Adopted
As Aramco standard
Zero
Operator exposure
Auto
Stops at interface

Conceptual design, project proposal and detailed engineering design for a fully automated tank de-watering system at the Abqaiq Plant — the largest crude oil processing and stabilisation facility operated by Saudi Aramco.

Key outcomes

  • Design adopted as a Saudi Aramco standard requirement for all storage tanks and incorporated into the updated Operation Manual.
  • Eliminated operator exposure to hydrocarbon vapours and automated drainage to the oil/water interface.
PipelinesSaudi Arabia
Hofouf, KSA
Duration: 3 years

Crude Oil Delivery System — Saudi Cement Plant, Hofouf

35 km
8" pipeline
Full
DBSP→commissioning
Custody
Transfer metering
HAZOP
+ EIA + Hydraulics

Prepared the DBSP, preliminary and detailed design of a Crude Oil Delivery System including a 35 km, 8" cross-country pipeline, custody-transfer metering station, scraper trap launcher and receiver, control room and leak-detection system. Provided construction support, commissioning and start-up coordination.

Key outcomes

  • Scope of work, bid documents, material requisitions and technical evaluation support.
  • Coordinated Risk Assessment, HAZOP, Environmental Impact Assessment and Hydraulic Analysis studies.
  • Construction support, commissioning and start-up coordination through to operational handover.
PipelinesSaudi Arabia
Dhahran, KSA
Duration: 1 year

DR-1 Pipeline Capacity Upgrade — Saudi Aramco Bulk Plant

+30%
Pipeline capacity
Zero
Downtime
VFD
Pumping
DRA
Injection skid

Construction support for the upgrade of the existing DR-1 pipeline, increasing capacity to the Riyadh Refinery by approximately 30 %. New booster and shipping pumps (VFD driven) and a new chemical-injection (DRA) skid were installed within the existing operational envelope.

Key outcomes

  • Pipeline throughput increased by approximately 30 % to meet growing refinery demand.
  • VFD-driven pump systems delivering energy and operational flexibility.
  • Zero operational downtime through the upgrade thanks to disciplined construction supervision.
RefineryMorocco
Mohammedia, Morocco
Duration: 3 years

Modernization of SAMIR Refinery — Mohammedia

27
Tanks delivered
500K+ m³
Combined capacity
45,000 m³
Largest tank
3 yrs
On-site presence

Modernization of tank farms, loading and unloading facilities and firefighting system at the Mohammedia refinery and terminal. Construction supervision for rehabilitation or new construction of 27 tanks of varying sizes and types (up to 45,000 m³).

Key outcomes

  • 27 storage tanks rehabilitated and newly built — combined capacity exceeding 500,000 m³.
  • Firefighting infrastructure upgraded to current international safety standards.
  • Loading and unloading facilities modernised — higher throughput, higher safety.
  • Operational philosophy upgraded for oil movements — minor piping modifications produced major quality gains, especially for sensitive low-sulphur products.
  • Operational philosophy for optimal storage-tank usage, with recommended piping modifications for refined products.
  • Process flow diagrams reissued in line with the new operating regime.
Power GenerationLebanon
Zouk, Lebanon
Duration: 6 years

EDL Power Station Fuel Sea Lines — Operations & Maintenance

700,000+ t/yr
Discharged
Zero
Environmental incidents
6 yrs
Continuous service
20" + 6"
Sea lines

Operations and maintenance of 20" and 6" fuel-oil sea lines, ensuring the discharge of more than 700,000 tons of oil products per year. Supervision of periodic maintenance: motorized valve and control panel replacement, replacement of 6" and 20" flexible hoses, and installation of a new cathodic protection system.

Key outcomes

  • 700,000+ tons of fuel oil discharged annually with zero environmental incidents.
  • Preventive-maintenance programme extending equipment lifespan and minimising unplanned downtime.
  • Upgraded cathodic protection system safeguarding long-term sea-line integrity.
Fuel TerminalLebanon
Jieh, Lebanon
Duration: 5 months

Evaporation Losses Control — Cogico Terminal

0.8% → 0.05%
Monthly losses
-94%
Reduction
5 mo
Programme duration
Peak
Summer validated

Inspection of tank bodies and accessories, root-cause identification of vapor losses, then targeted calibration and modifications. Result: monthly gasoline losses reduced from 0.8 % to 0.05 % during the hottest period of the year — a 94 % improvement.

Key outcomes

  • Dramatic 94 % reduction in monthly evaporation losses.
  • Significant cost savings and environmental compliance gains.
  • Solutions held up under peak summer temperatures.
LPG TerminalLebanon
Jounieh, Lebanon
Duration: 5 months

Rehabilitation of Liquigas Terminal

5 mo
On-schedule delivery
API
Gravity separator
Full
Terminal scope

Comprehensive terminal inspection, scope definition for maintenance, execution of repairs and modifications, design of a new drainage system including an API gravity separator, and supervision of the rehabilitation works through to operational handover.

Key outcomes

  • Engineered API gravity separator ensuring environmental compliance.
  • Full terminal rehabilitation delivered on schedule.
  • Drainage system preventing environmental contamination.
Fuel TerminalLebanon
Dora, Lebanon
Duration: 3 months

Rehabilitation of Jirco Terminal

3 mo
Fast-track
Full
Systems re-commissioned
Min
Operational downtime

Comprehensive terminal inspection, maintenance scope definition, supervision of rehabilitation works and commissioning / start-up operations — delivered against a fast-track three-month programme.

Key outcomes

  • Rapid 3-month rehabilitation minimising operational downtime.
  • Successful commissioning and start-up across all systems.
  • Long-term maintenance programme established for ongoing reliability.
Oil & Gas UpstreamSaudi Arabia
Khurais Field, KSA
Duration: 18 months

Khurais Upstream Facilities — Detailed Design

14
Oil manifolds
237
Oil wells
144
Water-injection wells
~1,390 km
Pipe network

Detailed engineering for Saudi Aramco's Khurais upstream facilities: 14 oil manifolds with trunk-line sizes up to 36" (~630 km total), 237 oil wells with flowlines up to 12" (~600 km total) and 144 water-injection wells with 8" laterals (~160 km total).

Key outcomes

  • Full detailed engineering package: PFDs, P&IDs, datasheets, flowline and trunk-line routing verification, plan & profile drawings, chemical injection rates and material take-off.
  • Hydraulic calculations and piping isometrics for trunk-line sizes up to 36".
  • Combined oil and water-injection network of approximately 1,390 km across the field area.
Oil & Gas UpstreamSaudi Arabia
Nuayyim / Hawtah Area, KSA
Duration: 2 years

Nuayyim ASL Crude Increment 100 MBCD & Downstream Facilities

100 MBCD
ASL increment
Lead
Piping engineer
Crude + Water
Pipeline scope
Hawtah
Field area

Lead piping engineer on the Nuayyim ASL (Arab Super Light) Crude Increment of 100 MBCD and associated downstream facilities in the Hawtah area. Scope spanned the design of multiple crude oil and water pipeline sizes — P&IDs, piping, layout, plan and profile drawings, pipeline calculations, road crossings, elastic bending design, hydrostatic test pressure, hydraulic calculation and analysis, safety instructions, project text, data sheets and material take-off.

Key outcomes

  • Lead piping discipline across the 100 MBCD crude increment and associated downstream facilities.
  • Designed crude and water pipelines of varied sizes with full hydraulic analysis and hydrotest planning.
  • Engineered road crossings and elastic bending for the cross-country pipeline routes.
PipelinesSaudi Arabia
Hawtah Area, KSA
Duration: 6 months

Scraper Launcher & Receiver Facilities — Hawtah HEW 3-1 Pipeline

PM
Project Manager
HEW 3-1
Pipeline
6 mo
Programme
Multi-disc.
Deliverables

Project management for new scraper launcher and receiver facilities on the Saudi Aramco HEW 3-1 pipeline in the Hawtah area. Deliverables included P&IDs, overall layout, plot plan, piping, grading, structural, instrumentation and electrical drawings, equipment data sheets, project text and material take-off.

Key outcomes

  • End-to-end project management for the launcher/receiver facilities on the HEW 3-1 pipeline.
  • Multidisciplinary deliverables — process, piping, civil/grading, structural, instrumentation and electrical.
  • Procurement-ready package: P&IDs, plot plan, drawings, datasheets and material take-off.
LPG TerminalLebanon
Daora, Lebanon
Duration: 6 months

LPG Spheres Construction Supervision — UNIGAZ Daora

2 × 5,000 m³
LPG spheres
−10
Cylindrical tanks replaced
6 mo
Supervision
Owner-Eng.
Acting for the MoE

Construction supervision on behalf of the Lebanese Ministry of Energy for the replacement of 10 cylindrical gas tanks by two 5,000 m³ LPG spheres at the UNIGAZ Terminal in Daora. Scope included review of detailed drawings and material documentation, review of test reports, verification of compliance with applicable standards, and reporting to the Ministry.

Key outcomes

  • Acted as the Ministry of Energy's engineering supervisor on a critical national LPG storage upgrade.
  • Reviewed detailed design drawings, material documentation and test reports.
  • Verified compliance with applicable codes and standards and reported to the client throughout the works.
Dispute ResolutionSaudi Arabia
Saudi Arabia
Duration: 2-day negotiation

Supplier Dispute Mediation — USD 900k Equipment Procurement, KSA

USD 900k
Original order
USD 600k
Supplier claim
USD 93k
Agreed settlement
2 days
To agreement

Technical specifications, tender documents and technical bid evaluation for advanced industrial equipment for a major Saudi manufacturing facility, followed by the resolution of a supplier dispute. Four months into fabrication, the selected supplier stopped work and claimed USD 600,000 on a USD 900,000 order. Every claimed item was checked against the tender record, the real cause was found, and a USD 93,000 settlement the client could approve was agreed in two working days.

Key outcomes

  • Supplier's USD 600,000 claim reduced by USD 507,000 (84.5%) — the final increase was about 10.3% of the original order.
  • More than 30 claimed extras checked against the tender record; only USD 12,000 was genuinely new scope.
  • Fabrication restarted with the specified equipment, avoiding an international contract dispute.
Your project

Want to see your project on this page?

Let's design, troubleshoot or modernize the asset that's currently costing you efficiency, safety margin or compliance peace of mind.