Construction Support
On-site engineering coordination through the upgrade execution — sequencing, tie-ins and quality oversight.
Capacity uprate of the existing DR-1 pipeline to the Riyadh Refinery — new VFD-driven booster and shipping pumps plus a new DRA chemical injection skid, delivered without operational downtime.
Case study published 18 May 2026 · Last reviewed 20 May 2026
Construction Support · Engineering Coordination
On-site engineering coordination through the upgrade execution — sequencing, tie-ins and quality oversight.
Specification and installation oversight for new VFD-driven booster and shipping pumps replacing the existing duty.
Integration of a new drag-reducing agent injection skid into the pipeline for sustained throughput gain.
Construction sequencing engineered to deliver the upgrade without interrupting refinery feed.
Two levers were combined to deliver the 30 % capacity gain. Hydraulic head was increased through new VFD-driven booster and shipping pumps — the variable speed drive giving the operations team flexibility to match pumping power to demand and protecting energy efficiency at part-load. In parallel, a new DRA chemical injection skid reduced frictional pressure drop along the pipeline, allowing the additional throughput without changes to the pipe itself. Construction was sequenced around continuous refinery operation, with tie-ins and switchovers scheduled to preserve feed.
Pipeline throughput increased by approximately 30 % to meet the growing demand of the Riyadh Refinery.
VFD-driven pump systems optimised energy consumption and gave operators flexibility across operating regimes.
No operational interruption during the upgrade — refinery feed preserved throughout construction.
The services behind this project, explained in depth.
Send the brief — Eng. Naim replies personally with a discovery-call invitation and a short qualification questionnaire.