Rehabilitation of Liquigas Terminal

Comprehensive LPG terminal rehabilitation — inspection-led scope, design of a new drainage system including an API gravity separator, and supervision of the works through to handover.

Case study published 20 May 2026

Location
Jounieh, Lebanon
Duration
5 months
End Client
Liquigas
Role

Inspection · Scope Definition · Design · Construction Supervision

5 mo
On-schedule delivery
API
Gravity separator
Full
Terminal scope
Project Background

The context that shaped the engineering.

Liquigas's LPG terminal at Jounieh required a comprehensive rehabilitation programme: years of operation had built up a list of mechanical and infrastructure items, and the drainage and environmental compliance side of the facility needed engineering attention rather than incremental patching. The objective was to inspect the terminal end-to-end, define a single coherent scope of work, execute the necessary repairs and modifications, design a new drainage system anchored on an API gravity separator, and supervise the rehabilitation through to handover.
Scope of Services

What was delivered.

01

Terminal Inspection

Comprehensive inspection covering mechanical, civil, drainage and environmental elements of the terminal.

02

Maintenance Scope Definition

Translated inspection findings into a prioritised, executable scope of repairs and modifications.

03

Drainage System Design

New drainage system anchored on a properly engineered API gravity separator for environmental compliance.

04

Rehabilitation Supervision

On-site supervision of the rehabilitation works, ending in operational handover.

Design Solution

How the engineering came together.

Integrated multidisciplinary delivery

The drainage design was the technical pivot of the project. Rather than retrofit ad-hoc drainage, an API gravity separator was sized and integrated as the backbone of the system — reliable, low-maintenance and aligned with the environmental performance expected of a modern LPG terminal. Around it, the rehabilitation works addressed the prioritised maintenance scope under construction supervision, with the programme delivered against the agreed five-month schedule.

Key Outcomes

The results the client took to operations.

Environmental Compliance

New drainage system with API gravity separator preventing hazardous-product contamination and meeting environmental obligations.

On-Schedule Delivery

Full terminal rehabilitation delivered within the five-month programme — operations resumed without overrun.

Operational Restoration

Mechanical and infrastructure items closed out, terminal handed back to operations in a maintained and compliant state.

Disciplines Covered

Multidisciplinary by design.

MechanicalPipingDrainage EngineeringAPI Separator DesignInspectionConstruction SupervisionEnvironmental Compliance
Need this capability?

The services behind this project, explained in depth.

Your project

Have a similar engineering problem on your asset?

Send the brief — Eng. Naim replies personally with a discovery-call invitation and a short qualification questionnaire.