Contractor & EPC Design Review
Independent review of design packages — calculations, drawings, datasheets and deviations — against codes, contract and the owner's operating interest, before fabrication locks the decisions in.
When the contractor designs it, builds it and certifies it, the owner needs one party in the room whose only interest is the asset being right. That is the owner's engineer role: independent review of what is designed, verification of what is built, and early warning of what is drifting.
The independence here is structural, not rhetorical — no contractor affiliations, no vendor commissions, no equity in the outcome except a correct asset. The Lebanese Ministry of Energy engaged this practice as its engineering supervisor for the replacement of ten cylindrical LPG tanks with two 5,000 m³ spheres at UNIGAZ Daora: drawing and material review, test-report verification, code compliance and exception reporting, milestone by milestone. The same discipline serves lender's engineer and technical due-diligence mandates.
Independent review of design packages — calculations, drawings, datasheets and deviations — against codes, contract and the owner's operating interest, before fabrication locks the decisions in.
Milestone-based site verification, material and test-report review, witness points and exception reporting — so the owner signs progress payments on evidence, not assurances.
Asset and project assessment for acquisitions, financing and investment decisions — condition, design adequacy, capex realism and the technical risks that belong in the price.
Scope-of-work and ITB preparation, technical bid evaluation and clarification management — applied across programmes from SAMIR tank packages to Saudi Aramco projects.
Performance test witnessing, punch-list discipline and documentation review so handover is a verified event, not a paperwork formality.
Independent technical opinion in disputes between owners, contractors and vendors — grounded in three decades of design and field experience across storage, terminals and pipelines.
Engagements run project-based (defined scope and deliverables), as a standing technical advisory retainer, or start small with a fixed-scope audit — see engagement models.
The discipline is the same — independent technical review and verification. The client differs: an owner's engineer protects the project owner's interest against contractor drift; a lender's (independent) engineer gives financiers an independent view of technical risk, progress and budget realism. This practice serves both mandates.
Structurally independent: a solo senior practice with no contractor affiliations, no vendor or equipment commissions, and no stake in construction outcomes. The only deliverable is a correct technical opinion — which is precisely why the Lebanese Ministry of Energy used this practice to supervise a national LPG storage upgrade.
Scoped to the decision it supports — typically design adequacy against codes and intended service, asset condition, outstanding capex and its realism, compliance exposure, and the technical risks that should be priced or contracted for. Findings are reported in plain language an investment committee can act on.
Yes — that is the normal configuration. The role exists precisely to review someone else's design and construction with independent eyes; prior involvement in the design would compromise it.
A short description of your facility and challenge is enough to start. You'll get a discovery call invitation and an initial qualification questionnaire — available worldwide.