Pipeline engineering & custody transfer metering.

Pipelines reward discipline. Routing, hydraulics, metering accuracy and integrity provisions are locked in at the design stage — and an operator lives with those choices through every barrel that moves for the next thirty years.

35 km
Grassroots crude line
+30%
Capacity uprate, zero downtime
~1,390 km
Khurais network designed
100 MBCD
Crude increment — lead piping

Why it matters.

The track record spans the full range: a 35 km grassroots crude line delivered end-to-end (DBSP through commissioning) with custody metering, pigging and leak detection; a +30% capacity uprate of a live Saudi Aramco products line executed with zero downtime; lead piping engineering on a 100 MBCD crude increment; and detailed design across the ~1,390 km Khurais flowline and trunk-line network.

Scope of service

What this service covers.

01

Routing, Plan & Profile

Route selection and verification, plan and profile drawings, road and utility crossings and elastic-bending design for cross-country alignments.

02

Hydraulic Analysis & Sizing

Steady-state and transient hydraulics, line sizing, pump head and station spacing — the calculations that decide both capex and the energy bill.

03

Custody Transfer Metering Stations

Metering station design to commercial-accuracy standards — meter selection, proving philosophy, instrumentation and the documentation custody transfer demands.

04

Leak Detection & Pipeline Integrity

Leak detection system architecture integrated with SCADA, plus pigging facilities — scraper launcher and receiver design — for ongoing cleaning and inspection capability.

05

Capacity Uprates of Live Pipelines

More throughput from the same right-of-way: VFD-driven pumping upgrades and DRA injection systems, with construction sequenced so the line keeps delivering — as on the +30% DR-1 uprate.

06

Studies & Execution Support

HAZOP, risk assessment, EIA and hydraulic study coordination; bid documents and technical evaluation; construction support, hydrotest planning and commissioning.

Codes & standards

Designed to the standards your regulator reads.

ASME B31.4ASME B31.3API MPMSAPI 1130OIML R117Saudi Aramco SAES
Who this is for

Built for owners, operators and their partners.

  • Industrial plants and terminals needing a dedicated supply or delivery line
  • Operators who need more capacity from an existing pipeline without re-laying it
  • Owners needing custody-transfer accuracy and leak detection that stand up commercially

Engagements run project-based (defined scope and deliverables), as a standing technical advisory retainer, or start small with a fixed-scope audit — see engagement models.

Download the capability statement (PDF)

FAQ

Common questions about this service.

Can pipeline capacity be increased without laying a new line?

Often, yes — by raising hydraulic head with upgraded (typically VFD-driven) pumping and reducing friction with drag-reducing agent (DRA) injection. On the Saudi Aramco DR-1 line this combination delivered approximately 30% more throughput to the Riyadh Refinery with zero operational downtime.

What does a custody transfer metering station involve?

Commercial-grade measurement: properly selected meters, a proving arrangement, conditioning of the flow, pressure and temperature compensation, and documentation that both parties to the transfer can rely on. It is designed to measurement standards (API MPMS, OIML R117), not just to move product.

How is leak detection handled on a new line?

As part of the original design, not an afterthought: metering at line inlet and outlet, a computational monitoring approach matched to the line's operating profile, and SCADA integration in the control room — as delivered on the 35 km Saudi Cement crude line.

Do you coordinate the safety and environmental studies?

Yes — Risk Assessment, HAZOP, Environmental Impact Assessment and hydraulic studies are coordinated and embedded into the design so safety, compliance and operability are validated before construction, as on the Hofouf pipeline programme.