Project Management
Programme management of the launcher/receiver design scope through to procurement-ready deliverables.
Project management of new scraper launcher and receiver facilities on the Saudi Aramco HEW 3-1 pipeline — P&IDs, layouts, piping, grading, structural, instrumentation, electrical and full procurement-ready deliverables.
Case study published 20 May 2026 · Last reviewed 10 June 2026
Project Manager
Programme management of the launcher/receiver design scope through to procurement-ready deliverables.
P&IDs, plot plan, piping, grading, structural, instrumentation and electrical drawings.
Equipment datasheets and project text supporting the technical scope.
Material take-off for procurement of mechanical, piping, structural, instrumentation and electrical scope.
The package was sized to be procurement-ready at the end of the six-month programme — meaning the technical, structural and material deliverables had to line up cleanly with one another and with the surrounding pipeline. Project management discipline kept the multidisciplinary scope tracking on a single schedule, so launcher and receiver could be built and tied in without iterations between disciplines after the design phase closed.
Dedicated launcher and receiver facilities enabling routine scraping and integrity management.
Coordinated multidisciplinary deliverables — drawings, datasheets and material take-off — ready for procurement and construction.
Full design and PM scope delivered on a tight six-month programme.