Fixed-scope audits for fuel terminals & tank farms.

Three defined scopes at published fees. Each audit puts Eng. Oussama Naim on site for three to five days and ends in a written report that measures the problem, sets out the fix and prices the return — a low-risk first step before any capital is committed.

−94%
Monthly gasoline losses — Cogico
−70%
Power & maintenance cost — IPT
From €9,500
Fixed fee · 3–5 days on site
The audits

Three audits, each with a fixed scope and fee.

Each audit draws on work already delivered on operating assets: the programme that cut Cogico's monthly gasoline losses from 0.8% to 0.05%, the gravity-assisted loading redesign that cut IPT Terminal's power consumption and maintenance cost by approximately 70%, and the custody-transfer metering station engineered for Saudi Cement's 35 km crude oil line. Each report stands on its own — what happens next is the owner's call.

01

Terminal Vapor-Loss Audit

Find out how much gasoline your tanks lose to evaporation, where it escapes, and what stopping it is worth.

From €18,000

Fixed fee for the standard scope, plus travel

Typical duration: 5 days on site, then the written report

Who it's for

  • Gasoline terminal and depot operators carrying chronic monthly stock losses
  • Terminal managers and refinery operations directors who need a defensible loss figure before approving a retrofit
  • Operators under emissions pressure from regulators or neighbors
Request this audit: Terminal Vapor-Loss Audit

What's included

  • Five-day site visit covering the gasoline tankage, its accessories and the stock records
  • Full vapor balance: gauging, temperature and movement records reconciled into a defensible monthly loss figure
  • Inspection of seals, roof fittings, vents and breathing devices, separating breathing losses from tank-fabric leaks
  • Pressure-vacuum valve setpoints checked against each tank's operating pattern
  • Measurement error screened out before it is booked as evaporation
  • Every loss path quantified and ranked by the product it would recover

Deliverables

  • Written report quantifying the evaporation loss in volume and in money
  • Ranked list of loss paths, with each one's share of the loss and its fix
  • Retrofit plan with a cost estimate and ROI for each measure
  • Debrief with operations and finance

Proof: Cogico Vapor-Loss Control

Monthly gasoline losses cut from 0.8% to 0.05% — a 94% reduction, validated at peak summer.

02

Tank-Farm Power & Pumping Optimization Audit

See where a tank farm's power and pumping costs go — and which retrofits pay back.

From €15,000

Fixed fee for the standard scope, plus travel

Typical duration: 4 days on site, then the written report

Who it's for

  • Terminal managers and operations directors facing rising power and maintenance bills
  • Sites whose pumps were sized for nameplate flow rather than today's operating profile
  • Owners planning a pumping or electrical upgrade who want the savings case first
Request this audit: Tank-Farm Power & Pumping Optimization Audit

What's included

  • Four-day site visit covering pumping, product heating, lighting and site utilities
  • Energy baseline built from power bills, meter readings and equipment running hours
  • Pump operating points compared with design duty to expose throttling, recirculation and oversizing losses
  • Variable-speed drive (VFD) and gravity-loading options screened where site elevation and tankage allow
  • Product heating and lighting loads checked against actual operating need
  • Maintenance cost of rotating equipment counted alongside energy in the savings case

Deliverables

  • Written report with the energy baseline for pumping, heating, lighting and utilities
  • Quantified savings for each measure — energy and maintenance
  • Retrofit plan with a cost estimate and ROI for each measure
  • Debrief with operations and finance

Proof: IPT Terminal Renovation

Gravity-assisted loading redesign cut power consumption and maintenance cost by approximately 70%.

03

Custody-Transfer Metering Health Check

Confirm that the meter your revenue runs through is still accurate — and what any drift is costing.

From €9,500

Fixed fee for the standard scope, plus travel

Typical duration: 3 days on site, then the written report

Who it's for

  • Terminal managers responsible for a LACT, dispatch or loading metering skid
  • Commercial directors protecting revenue at the point of transfer
  • Operators seeing unexplained differences between their own figures and the counterparty's
Request this audit: Custody-Transfer Metering Health Check

What's included

  • Three-day site audit of one metering skid — LACT, dispatch or loading
  • Measurement chain reviewed end to end: meter, proving arrangement, flow conditioning, pressure and temperature compensation
  • Meter-factor and proving history analyzed for drift
  • Installation and practice checked against the applicable measurement standards (API MPMS, OIML R117)
  • Maintenance and calibration records compared with what custody transfer demands
  • Measurement error translated into money at the skid's actual throughput

Deliverables

  • Health-check report on accuracy, drift and maintenance gaps
  • Estimate of what measurement error is worth at current throughput
  • Prioritized corrective actions: recalibration, maintenance or skid upgrade
  • Debrief with operations and the commercial team

Proof: Saudi Cement Crude Pipeline

Custody-transfer metering station engineered for commercial crude transfer on a 35 km pipeline, from DBSP through commissioning.

How it works

Five steps from kick-off to debrief.

The same sequence runs for all three audits — only the systems inspected and the days on site change.

  1. 01

    Kick-off & data request

    A short call confirms the site, scope, dates and fee. A data request follows — drawings and the stock, energy or meter records — reviewed remotely before arrival. An NDA can be signed before any data changes hands.

  2. 02

    Site visit

    Three to five days on site, depending on the audit: inspection, field measurements and time with the operators who run the equipment every day.

  3. 03

    Analysis

    Field findings and site records are reconciled into one baseline. Each loss path is quantified and the options to fix it are costed.

  4. 04

    Written report

    A plain-language report: what was measured, what it is costing, what to fix first and the expected return on each measure.

  5. 05

    Debrief

    A walk-through of the findings with operations and management, on site or by video, ending in an agreed list of next steps.

Why a fixed-scope audit first.

Open-ended consulting is hard to budget and harder to get through procurement. A defined scope at a published fee is easy to approve and easy to compare — and it lets an owner judge the engineering on one real problem before committing to a larger programme.

  • Known fee, known scope

    Fee, days on site and deliverables are fixed before kick-off — no open-ended hours.

  • Measured, not assumed

    Findings come from inspection, field measurement and the site's own records.

  • Independent advice

    No vendor commissions or contractor ties behind any recommendation.

  • No obligation

    The report stands on its own — act on it in-house or with any contractor.

FAQ

Common questions about the audits.

What does the fixed fee cover?

The days on site, the analysis, the written report and the debrief, for the standard scope described on each audit — one metering skid for the custody-transfer health check, for example. Travel is charged on top. Larger sites are quoted as a fixed fee before kick-off, never as open-ended hours.

Does the terminal have to stop operating during the audit?

No. Inspection, measurement and record review are scheduled around normal receipt and dispatch, and anything that needs a permit, an isolation or special access is agreed with the site team at kick-off.

How soon can an audit start?

Typically within one to two weeks of the scope being confirmed, depending on site access and travel. The data request goes out at kick-off, so the days on site are spent inspecting and measuring rather than searching for records.

Where can the audits be carried out?

Worldwide. The practice is based in Tripoli, Lebanon, and mobilizes to site on any continent; past assignments span Lebanon, Saudi Arabia, Morocco, Ghana and France. The work can be carried out in English, French or Arabic.

What happens after the audit?

The report is yours to act on — in-house, with a contractor, or with Eng. Naim. Where the findings justify a retrofit, the detailed engineering, a metering-skid upgrade design or construction supervision can be quoted as a separate, defined scope. There is no obligation to continue.

Next step

Name the audit and the site — get a confirmed scope, fee and dates.

A short note on the facility and the problem is enough to start. You'll get an invitation to a free 30-minute discovery call, then a written confirmation of scope, fee and dates — available worldwide.