Fuel TerminalLebanon

Renovation and Expansion of IPT Terminal

Full revamp of 9 existing tanks and construction of 4 new tanks (28,000 m³ total) with a complete operational core: pumping, loading, control, firefighting, piping, drainage, electrical and instrumentation.

Case study published 18 May 2026 · Last reviewed 10 June 2026

Location
Amchit, Lebanon
Duration
5 years
End Client
IPT Terminal
Role

Detailed Design · Construction Supervision · Material Procurement Assistance · Project Management

Case study PDFÉtude de cas (FR)

-70%
Power consumption
-70%
Maintenance cost
28,000 m³
Total tankage
13
Tanks (9 + 4 new)
Project Background

The context that shaped the engineering.

IPT Terminal in Amchit is one of Lebanon's principal bulk petroleum storage facilities, serving as a strategic node for the import, storage and distribution of refined products across the country. Over a continuous five-year engagement, Eng. Naim delivered the full revamp and expansion of the terminal — from initial detailed design through to construction supervision, material procurement assistance and overall project management. The programme rehabilitated the entire existing storage base of 9 tanks (16,000 m³), added 4 new storage tanks (12,000 m³), and introduced a fully redesigned operational core including the delivery pump station, road tanker loading station, control room, firefighting system, piping network, storm-water and drainage system, and the supporting electrical and instrumentation systems.
Scope of Services

What was delivered.

01

Detailed Engineering Design

Across process, mechanical, piping, electrical, instrumentation and firefighting disciplines.

02

Material Procurement Assistance

Specification and procurement support for tanks, pumps, valves, piping and control equipment.

03

Construction Supervision

Full-time supervision through demolition, civil, mechanical, electrical and commissioning phases.

04

Project Management

End-to-end planning, scheduling, contractor coordination, quality assurance and HSE oversight.

05

Commissioning & Handover

Pre-commissioning, commissioning and operational handover support to plant teams.

Design Solution

How the engineering came together.

Integrated multidisciplinary delivery

Two innovations defined the project. First, a custom-designed gravity-assisted road tanker loading system reduced reliance on active pumping during dispatch — addressing the three persistent pain points of conventional tanker loading: high power consumption, high maintenance overhead, and safety exposure during transfer. Second, a purpose-engineered closed-circuit API separator replaced the conventional open-pit approach with a steel, fully sealed unit using gravity-based oil and water removal, achieving zero air emissions and a minimal operations & maintenance footprint.

Project Gallery

From the field.

IPT Terminal Renovation — photo 1
IPT Terminal Renovation — photo 2
IPT Terminal Renovation — photo 3
IPT Terminal Renovation — photo 4
Key Outcomes

The results the client took to operations.

70 % Power Reduction

Gravity loading system cut overall operations power consumption by approximately 70 %.

70 % Maintenance Cost Reduction

The same gravity-based architecture reduced maintenance overhead by approximately 70 %.

Closed-Circuit API Separator

Steel, fully sealed unit with gravity oil/water removal — zero air emissions, minimal O&M.

Modernised Terminal

13 tanks (28,000 m³) plus new pumping, loading, firefighting, control and drainage — ready for long-term strategic operation.

Disciplines Covered

Multidisciplinary by design.

ProcessMechanicalPipingElectricalInstrumentation & ControlFirefightingStorm Water & DrainageStorage Tank Engineering
Your project

Have a similar engineering problem on your asset?

Send the brief — Eng. Naim replies personally with a discovery-call invitation and a short qualification questionnaire.