Detailed Design
Dry-air / nitrogen blanketing — inert gas supply, distribution piping, tank connections and pressure-vacuum control architecture.
Dry-air / nitrogen blanketing, tank safety accessories and automated pressure control to keep hygroscopic polyol product dry across all loading, unloading and thermal scenarios.
Case study published 18 May 2026 · Last reviewed 20 May 2026
Dry-air / nitrogen blanketing — inert gas supply, distribution piping, tank connections and pressure-vacuum control architecture.
Pressure-vacuum relief, flame protection and emergency venting specified in line with applicable storage codes.
Automated regulation of blanket gas supply and relief setpoints — stable internal pressure across breathing, transfer and thermal swings.
Technical specifications, vendor qualification support and procurement of the complete moisture control package.
The system was engineered to maintain a continuous dry inert atmosphere above the stored polyol, isolating the product from ambient moisture under all operating modes. Blanket gas supply is regulated automatically against tank pressure: gas is admitted as tank pressure falls (during product outflow or temperature contraction) and excess pressure is relieved through dedicated safety devices (during product inflow or temperature expansion). The combination of automated pressure regulation and properly specified safety accessories was sized to handle the worst-case filling, emptying and thermal transient scenarios for the FAP tank fleet, while keeping operator intervention to routine inspection only.
Prevented hydrolytic contamination of stored polyol and extended usable shelf life by maintaining a dry inert atmosphere at all times.
Optimal storage conditions across loading, unloading and ambient temperature cycles with minimal operator intervention.
Integrated tank safety accessories ensure protection against both over-pressure and vacuum scenarios under all anticipated conditions.
Full detailed design and material procurement assistance scope completed within a four-month programme — minimal facility downtime.
The services behind this project, explained in depth.
Send the brief — Eng. Naim replies personally with a discovery-call invitation and a short qualification questionnaire.