Oil & Gas UpstreamSaudi Arabia

Nuayyim ASL Crude Increment 100 MBCD & Downstream Facilities

Lead piping engineering for the 100 MBCD Nuayyim Arab Super Light (ASL) crude increment and associated downstream facilities — crude and water pipelines, road crossings, elastic bending, hydraulics and hydrotest planning.

Case study published 20 May 2026 · Last reviewed 22 May 2026

Location
Nuayyim / Hawtah Area, KSA
Duration
2 years
End Client
Saudi Aramco
While At
Khatib & Alami
Role

Lead Piping Engineer

100 MBCD
ASL increment
Lead
Piping engineer
Crude + Water
Pipeline scope
Hawtah
Field area
Project Background

The context that shaped the engineering.

The Nuayyim ASL Crude Increment added 100,000 barrels per day of Arab Super Light crude to Saudi Aramco's gathering infrastructure in the Hawtah area. Bringing a 100 MBCD increment online required new crude and water pipelines, associated facility tie-ins and a discipline of piping engineering that could keep the increment compatible with the existing operating system on day one.
Scope of Services

What was delivered.

01

P&IDs & Piping Design

Piping & instrumentation diagrams, piping layouts and plan/profile drawings for the crude and water pipeline scope.

02

Pipeline Calculations & Hydraulics

Pipeline sizing, hydraulic calculation and analysis across multiple crude and water pipeline sizes.

03

Road Crossings & Elastic Bending

Engineered crossings and elastic bending design for cross-country pipeline routes.

04

Hydrotest & Safety

Hydrostatic test pressure design and safety instructions for the pipeline scope.

05

Project Documentation

Project text, datasheets and material take-off for procurement and construction.

Design Solution

How the engineering came together.

Integrated multidisciplinary delivery

The piping discipline was structured to deliver an increment that was compatible with the existing Hawtah operating system on day one. Hydraulics, hydrotest planning and elastic bending design were carried out against the field-wide operating envelope, so the new crude and water pipelines could be tied in without forcing modifications upstream. The result was a 100 MBCD addition designed for clean integration, not a retrofit.

Key Outcomes

The results the client took to operations.

100 MBCD Increment Engineered

Lead piping engineering for the Arab Super Light crude increment and its supporting downstream facilities.

Integration-Ready Hydraulics

Pipeline sizing and hydraulic analysis designed against the existing Hawtah operating envelope.

Full Procurement Package

P&IDs, layouts, plan & profile drawings, datasheets and material take-off delivered for execution.

Disciplines Covered

Multidisciplinary by design.

PipingPipeline EngineeringHydraulicsMechanicalProcess
Need this capability?

The services behind this project, explained in depth.

Your project

Have a similar engineering problem on your asset?

Send the brief — Eng. Naim replies personally with a discovery-call invitation and a short qualification questionnaire.