LPG Spheres Construction Supervision — UNIGAZ Daora

Construction supervision, on behalf of the Lebanese Ministry of Energy, of the replacement of 10 cylindrical gas tanks by two 5,000 m³ LPG spheres at the UNIGAZ Terminal in Daora.

Case study published 20 May 2026 · Last reviewed 22 May 2026

Location
Daora, Lebanon
Duration
6 months
End Client
UNIGAZ
In Association With
Humber Inspection
Role

Construction Supervision

2 × 5,000 m³
LPG spheres
−10
Cylindrical tanks replaced
6 mo
Supervision
Owner-Eng.
Acting for the MoE
Project Background

The context that shaped the engineering.

The UNIGAZ Terminal at Daora is a key node in Lebanon's LPG storage infrastructure. The upgrade replaced an ageing fleet of 10 cylindrical gas tanks with two purpose-built 5,000 m³ LPG spheres — a more efficient and safer storage configuration. The Lebanese Ministry of Energy engaged this practice as its engineering supervisor for the construction phase, ensuring the works were executed to the design and to applicable standards.
Scope of Services

What was delivered.

01

Construction Supervision

On-site supervision of the construction of the two 5,000 m³ LPG spheres and the decommissioning of the cylindrical tank fleet.

02

Drawing & Documentation Review

Review of detailed fabrication drawings, material documentation and test reports submitted by the contractor.

03

Standards & Code Compliance

Verification of compliance with applicable LPG storage and pressure-vessel codes and standards.

04

Reporting to the Ministry

Regular progress, compliance and exception reporting to the Lebanese Ministry of Energy throughout the works.

Design Solution

How the engineering came together.

Integrated multidisciplinary delivery

As owner's engineer for the Ministry of Energy, the role was to make sure the spheres were built to specification — not to defend the contractor's programme. Drawing, material and test-report reviews were carried out before each milestone signature, code and standards compliance was verified item by item, and exceptions were surfaced to the Ministry early rather than at handover. The discipline of independent owner's engineering is what gives the operator confidence that a high-pressure LPG asset is fit for service from day one.

Key Outcomes

The results the client took to operations.

Two 5,000 m³ LPG Spheres Built

Replacement of 10 cylindrical tanks with two purpose-built spheres — safer, more efficient LPG storage at Daora.

Independent Compliance Verification

Construction verified against applicable codes and standards on behalf of the Lebanese Ministry of Energy.

Auditable Documentation Trail

Drawing reviews, material checks, test-report verification and Ministry reporting maintained throughout the programme.

Disciplines Covered

Multidisciplinary by design.

Construction SupervisionMechanicalStorage Tank / Pressure Vessel EngineeringPipingInspection & QACode & Standards Compliance
Need this capability?

The services behind this project, explained in depth.

Your project

Have a similar engineering problem on your asset?

Send the brief — Eng. Naim replies personally with a discovery-call invitation and a short qualification questionnaire.